{"id":4412,"date":"2024-02-29T19:04:23","date_gmt":"2024-03-01T04:04:23","guid":{"rendered":"http:\/\/inedc.com\/24\/?p=4412"},"modified":"2024-02-29T19:04:23","modified_gmt":"2024-03-01T04:04:23","slug":"concrete-delivery-delays-prompt-revised-schedule-for-mosquito-road-closure","status":"publish","type":"post","link":"http:\/\/inedc.com\/24\/government\/concrete-delivery-delays-prompt-revised-schedule-for-mosquito-road-closure\/","title":{"rendered":"Concrete Delivery Delays Prompt Revised Schedule for Mosquito Road Closure"},"content":{"rendered":"<p>El Dorado County, CA (Feb 29, 2024) &#8211; El Dorado County&#8217;s Department of Transportation faces setbacks as weather impacts the delivery of 1,100 cubic yards of concrete for Mosquito Bridge Replacement.<\/p>\n<hr \/>\n<p>In a move aimed at ensuring the structural integrity of the Mosquito Road Bridge replacement project, El Dorado County&#8217;s Department of Transportation (DOT) has announced a revised schedule for the closure of Mosquito Road. The closure, originally planned for Friday, March 15, 2024, at 10:00 pm through Saturday, March 16, 2024, at 5:00 pm, has been delayed due to adverse weather conditions affecting the delivery of 1,100 cubic yards of concrete.<\/p>\n<table class=\"ms-rteTable-default\">\n<tbody>\n<tr>\n<td class=\"ms-rteTable-default\"><strong>ROAD<\/strong><\/td>\n<td class=\"ms-rteTable-default\"><strong>DATES<\/strong><\/td>\n<td class=\"ms-rteTable-default\"><strong>DURATION<\/strong><\/td>\n<td class=\"ms-rteTable-default\"><strong>CLOSURE\/TRAFFIC CONTROLS<\/strong><\/td>\n<\/tr>\n<tr>\n<td class=\"ms-rteTable-default\">Mosquito Road &amp; Mosquito Bridge<\/td>\n<td class=\"ms-rteTable-default\">March 15, 2024<\/p>\n<p>to<\/p>\n<p>March 16, 2024<\/td>\n<td class=\"ms-rteTable-default\">10:00 pm<\/p>\n<p>to<\/p>\n<p>5:00 pm<\/td>\n<td class=\"ms-rteTable-default\">&nbsp;<\/p>\n<p>Closure at the gates<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p>This crucial construction phase involves the delivery and placement of concrete for the Pier 3 footing on the north side of the project. The decision to close Mosquito Road is rooted in the necessity to prioritize the safety of both motorists and construction workers.<\/p>\n<p>The concrete delivery, amounting to 120 truckloads, will occur at an estimated rate of 10 truckloads departing and returning per hour from the concrete batch plant. The closure is strategically planned to reduce conflicts between concrete trucks, pumps, and workers during nighttime operations.<\/p>\n<p>A designated detour route via Rock Creek Road has been established, and motorists are advised to anticipate delays and plan for additional travel time. The concrete truck route will traverse from the batch plant near Finnon Lake, through Rock Creek Road to Mosquito Cut-off Road, and down Mosquito Road to reach the Pier 3 location at the 3rd switchback on the north side of the river.<\/p>\n<p>During the closure, Rock Creek Road will serve as the primary access route, and motorists are urged to exercise caution, particularly at the intersections of Rock Creek Road\/Mosquito Cutoff Road and Mosquito Cutoff Road\/Mosquito Road during the nighttime concrete operations.<\/p>\n<p>To ensure smooth traffic flow, flaggers will be stationed strategically above the gates, providing adequate turn-around areas and coordinating with Emergency Services if required. The County expresses gratitude for the cooperation and patience of motorists and apologizes for any inconvenience resulting from this necessary closure.<\/p>\n<hr \/>\n<p><em>For inquiries related to this construction project, individuals are encouraged to contact the County&#8217;s Transportation main line at (530) 621-5900, selecting Option 3 for Engineering. The Department remains committed to keeping the public informed as the project progresses.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>UPDATE &#8211; Mosquito Road Bridge Replacement Project, Delays in Concrete Delivery, El Dorado County DOT, Construction Schedule<\/p>\n","protected":false},"author":1,"featured_media":4413,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jnews-multi-image_gallery":[],"jnews_single_post":{"source_name":"EDC DOT","source_url":"https:\/\/www.edcgov.us\/Government\/dot","via_name":"","via_url":"","override_template":"0","override":[{"template":"7","single_blog_custom":"","parallax":"1","fullscreen":"0","layout":"no-sidebar-narrow","sidebar":"default-sidebar","second_sidebar":"default-sidebar","sticky_sidebar":"1","share_position":"float","share_float_style":"share-normal","show_share_counter":"1","show_view_counter":"1","show_featured":"1","show_post_meta":"1","show_post_author":"1","show_post_author_image":"1","show_post_date":"1","post_date_format":"default","post_date_format_custom":"Y\/m\/d","show_post_category":"1","show_post_reading_time":"0","post_reading_time_wpm":"300","show_zoom_button":"0","zoom_button_out_step":"2","zoom_button_in_step":"3","show_post_tag":"1","show_prev_next_post":"0","show_popup_post":"1","number_popup_post":"1","show_author_box":"1","show_post_related":"1","show_inline_post_related":"1"}],"override_image_size":"0","image_override":[{"single_post_thumbnail_size":"crop-500","single_post_gallery_size":"crop-500"}],"trending_post":"0","trending_post_position":"meta","trending_post_label":"Trending","sponsored_post":"0","sponsored_post_label":"Sponsored by","sponsored_post_name":"","sponsored_post_url":"","sponsored_post_logo_enable":"0","sponsored_post_logo":"","sponsored_post_desc":"","disable_ad":"0"},"jnews_primary_category":{"id":"","hide":""},"jnews_social_meta":{"fb_title":"","fb_description":"","fb_image":"","twitter_title":"","twitter_description":"","twitter_image":""},"jnews_override_counter":{"override_view_counter":"0","view_counter_number":"0","override_share_counter":"0","share_counter_number":"0","override_like_counter":"0","like_counter_number":"0","override_dislike_counter":"0","dislike_counter_number":"0"},"footnotes":""},"categories":[5],"tags":[],"class_list":["post-4412","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-government"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Concrete Delivery Delays Prompt Revised Schedule for Mosquito Road Closure - Placerville NewsWire<\/title>\n<meta name=\"description\" content=\"Delays in Mosquito Road Closure: Concrete Delivery for Bridge Replacement Hits a Snag\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"http:\/\/inedc.com\/24\/government\/concrete-delivery-delays-prompt-revised-schedule-for-mosquito-road-closure\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Concrete Delivery Delays Prompt Revised Schedule for Mosquito Road Closure - Placerville NewsWire\" \/>\n<meta property=\"og:description\" content=\"Delays in Mosquito Road Closure: Concrete Delivery for Bridge Replacement Hits a Snag\" \/>\n<meta property=\"og:url\" content=\"http:\/\/inedc.com\/24\/government\/concrete-delivery-delays-prompt-revised-schedule-for-mosquito-road-closure\/\" \/>\n<meta property=\"og:site_name\" content=\"Placerville NewsWire\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/groups\/EDCnewswire\" \/>\n<meta property=\"article:author\" content=\"https:\/\/www.facebook.com\/groups\/EDCnewswire\" \/>\n<meta property=\"article:published_time\" content=\"2024-03-01T04:04:23+00:00\" \/>\n<meta property=\"og:image\" content=\"http:\/\/inedc.com\/24\/wp-content\/uploads\/2024\/02\/ScreenHunter-4899.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"849\" \/>\n\t<meta property=\"og:image:height\" content=\"615\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Cris Alarcon\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@https:\/\/twitter.com\/inedccom\" \/>\n<meta name=\"twitter:site\" content=\"@inedccom\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Cris Alarcon\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"http:\\\/\\\/inedc.com\\\/24\\\/government\\\/concrete-delivery-delays-prompt-revised-schedule-for-mosquito-road-closure\\\/#article\",\"isPartOf\":{\"@id\":\"http:\\\/\\\/inedc.com\\\/24\\\/government\\\/concrete-delivery-delays-prompt-revised-schedule-for-mosquito-road-closure\\\/\"},\"author\":{\"name\":\"Cris Alarcon\",\"@id\":\"http:\\\/\\\/inedc.com\\\/24\\\/#\\\/schema\\\/person\\\/6fe000a08266795285f981ef371f05f2\"},\"headline\":\"Concrete Delivery Delays Prompt Revised Schedule for Mosquito Road Closure\",\"datePublished\":\"2024-03-01T04:04:23+00:00\",\"mainEntityOfPage\":{\"@id\":\"http:\\\/\\\/inedc.com\\\/24\\\/government\\\/concrete-delivery-delays-prompt-revised-schedule-for-mosquito-road-closure\\\/\"},\"wordCount\":400,\"commentCount\":0,\"publisher\":{\"@id\":\"http:\\\/\\\/inedc.com\\\/24\\\/#organization\"},\"image\":{\"@id\":\"http:\\\/\\\/inedc.com\\\/24\\\/government\\\/concrete-delivery-delays-prompt-revised-schedule-for-mosquito-road-closure\\\/#primaryimage\"},\"thumbnailUrl\":\"http:\\\/\\\/inedc.com\\\/24\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/ScreenHunter-4899.jpg\",\"articleSection\":[\"Government\"],\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"http:\\\/\\\/inedc.com\\\/24\\\/government\\\/concrete-delivery-delays-prompt-revised-schedule-for-mosquito-road-closure\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"http:\\\/\\\/inedc.com\\\/24\\\/government\\\/concrete-delivery-delays-prompt-revised-schedule-for-mosquito-road-closure\\\/\",\"url\":\"http:\\\/\\\/inedc.com\\\/24\\\/government\\\/concrete-delivery-delays-prompt-revised-schedule-for-mosquito-road-closure\\\/\",\"name\":\"Concrete Delivery Delays Prompt Revised Schedule for Mosquito Road Closure - Placerville NewsWire\",\"isPartOf\":{\"@id\":\"http:\\\/\\\/inedc.com\\\/24\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"http:\\\/\\\/inedc.com\\\/24\\\/government\\\/concrete-delivery-delays-prompt-revised-schedule-for-mosquito-road-closure\\\/#primaryimage\"},\"image\":{\"@id\":\"http:\\\/\\\/inedc.com\\\/24\\\/government\\\/concrete-delivery-delays-prompt-revised-schedule-for-mosquito-road-closure\\\/#primaryimage\"},\"thumbnailUrl\":\"http:\\\/\\\/inedc.com\\\/24\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/ScreenHunter-4899.jpg\",\"datePublished\":\"2024-03-01T04:04:23+00:00\",\"description\":\"Delays in Mosquito Road Closure: Concrete Delivery for Bridge Replacement Hits a Snag\",\"breadcrumb\":{\"@id\":\"http:\\\/\\\/inedc.com\\\/24\\\/government\\\/concrete-delivery-delays-prompt-revised-schedule-for-mosquito-road-closure\\\/#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"http:\\\/\\\/inedc.com\\\/24\\\/government\\\/concrete-delivery-delays-prompt-revised-schedule-for-mosquito-road-closure\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"http:\\\/\\\/inedc.com\\\/24\\\/government\\\/concrete-delivery-delays-prompt-revised-schedule-for-mosquito-road-closure\\\/#primaryimage\",\"url\":\"http:\\\/\\\/inedc.com\\\/24\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/ScreenHunter-4899.jpg\",\"contentUrl\":\"http:\\\/\\\/inedc.com\\\/24\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/ScreenHunter-4899.jpg\",\"width\":849,\"height\":615},{\"@type\":\"BreadcrumbList\",\"@id\":\"http:\\\/\\\/inedc.com\\\/24\\\/government\\\/concrete-delivery-delays-prompt-revised-schedule-for-mosquito-road-closure\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"http:\\\/\\\/inedc.com\\\/24\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Concrete Delivery Delays Prompt Revised Schedule for Mosquito Road Closure\"}]},{\"@type\":\"WebSite\",\"@id\":\"http:\\\/\\\/inedc.com\\\/24\\\/#website\",\"url\":\"http:\\\/\\\/inedc.com\\\/24\\\/\",\"name\":\"News InEDC\",\"description\":\"Comprehensive News . In El Dorado County - InEDC.com\",\"publisher\":{\"@id\":\"http:\\\/\\\/inedc.com\\\/24\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"http:\\\/\\\/inedc.com\\\/24\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"},{\"@type\":\"Organization\",\"@id\":\"http:\\\/\\\/inedc.com\\\/24\\\/#organization\",\"name\":\"News InEDC\",\"url\":\"http:\\\/\\\/inedc.com\\\/24\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"http:\\\/\\\/inedc.com\\\/24\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"http:\\\/\\\/inedc.com\\\/24\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/logo-1.png\",\"contentUrl\":\"http:\\\/\\\/inedc.com\\\/24\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/logo-1.png\",\"width\":400,\"height\":128,\"caption\":\"News InEDC\"},\"image\":{\"@id\":\"http:\\\/\\\/inedc.com\\\/24\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/groups\\\/EDCnewswire\",\"https:\\\/\\\/x.com\\\/inedccom\"]},{\"@type\":\"Person\",\"@id\":\"http:\\\/\\\/inedc.com\\\/24\\\/#\\\/schema\\\/person\\\/6fe000a08266795285f981ef371f05f2\",\"name\":\"Cris Alarcon\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9e7e14e06508c2268b6f72e5713ecbbdf36482501dd12b326035e8591505c3bb?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9e7e14e06508c2268b6f72e5713ecbbdf36482501dd12b326035e8591505c3bb?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9e7e14e06508c2268b6f72e5713ecbbdf36482501dd12b326035e8591505c3bb?s=96&d=mm&r=g\",\"caption\":\"Cris Alarcon\"},\"description\":\"Former Member: Executive Board of Directors, Treasurer, Boys &amp; Girl Club of El Dorado County Western Slope. - Former Member: Board of Directors, Treasurer, Food Bank of El Dorado County. - Opening Team Dealer at Red Hawk Casino - Retried EDC Elections Department Inspector. - Chairman of El Dorado County Charter Review Committee, Youngest Charter Member of the Hangtown Kennel Club. - Political Strategist and Campaign Manager.\",\"sameAs\":[\"http:\\\/\\\/inedc.com\\\/24\",\"https:\\\/\\\/www.facebook.com\\\/groups\\\/EDCnewswire\",\"https:\\\/\\\/x.com\\\/https:\\\/\\\/twitter.com\\\/inedccom\",\"https:\\\/\\\/studio.youtube.com\\\/channel\\\/UCPFu68Ud5AouF2N14NzLeyw\\\/videos\"],\"url\":\"http:\\\/\\\/inedc.com\\\/24\\\/author\\\/admin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Concrete Delivery Delays Prompt Revised Schedule for Mosquito Road Closure - Placerville NewsWire","description":"Delays in Mosquito Road Closure: Concrete Delivery for Bridge Replacement Hits a Snag","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"http:\/\/inedc.com\/24\/government\/concrete-delivery-delays-prompt-revised-schedule-for-mosquito-road-closure\/","og_locale":"en_US","og_type":"article","og_title":"Concrete Delivery Delays Prompt Revised Schedule for Mosquito Road Closure - Placerville NewsWire","og_description":"Delays in Mosquito Road Closure: Concrete Delivery for Bridge Replacement Hits a Snag","og_url":"http:\/\/inedc.com\/24\/government\/concrete-delivery-delays-prompt-revised-schedule-for-mosquito-road-closure\/","og_site_name":"Placerville NewsWire","article_publisher":"https:\/\/www.facebook.com\/groups\/EDCnewswire","article_author":"https:\/\/www.facebook.com\/groups\/EDCnewswire","article_published_time":"2024-03-01T04:04:23+00:00","og_image":[{"width":849,"height":615,"url":"http:\/\/inedc.com\/24\/wp-content\/uploads\/2024\/02\/ScreenHunter-4899.jpg","type":"image\/jpeg"}],"author":"Cris Alarcon","twitter_card":"summary_large_image","twitter_creator":"@https:\/\/twitter.com\/inedccom","twitter_site":"@inedccom","twitter_misc":{"Written by":"Cris Alarcon","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"http:\/\/inedc.com\/24\/government\/concrete-delivery-delays-prompt-revised-schedule-for-mosquito-road-closure\/#article","isPartOf":{"@id":"http:\/\/inedc.com\/24\/government\/concrete-delivery-delays-prompt-revised-schedule-for-mosquito-road-closure\/"},"author":{"name":"Cris Alarcon","@id":"http:\/\/inedc.com\/24\/#\/schema\/person\/6fe000a08266795285f981ef371f05f2"},"headline":"Concrete Delivery Delays Prompt Revised Schedule for Mosquito Road Closure","datePublished":"2024-03-01T04:04:23+00:00","mainEntityOfPage":{"@id":"http:\/\/inedc.com\/24\/government\/concrete-delivery-delays-prompt-revised-schedule-for-mosquito-road-closure\/"},"wordCount":400,"commentCount":0,"publisher":{"@id":"http:\/\/inedc.com\/24\/#organization"},"image":{"@id":"http:\/\/inedc.com\/24\/government\/concrete-delivery-delays-prompt-revised-schedule-for-mosquito-road-closure\/#primaryimage"},"thumbnailUrl":"http:\/\/inedc.com\/24\/wp-content\/uploads\/2024\/02\/ScreenHunter-4899.jpg","articleSection":["Government"],"inLanguage":"en","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["http:\/\/inedc.com\/24\/government\/concrete-delivery-delays-prompt-revised-schedule-for-mosquito-road-closure\/#respond"]}]},{"@type":"WebPage","@id":"http:\/\/inedc.com\/24\/government\/concrete-delivery-delays-prompt-revised-schedule-for-mosquito-road-closure\/","url":"http:\/\/inedc.com\/24\/government\/concrete-delivery-delays-prompt-revised-schedule-for-mosquito-road-closure\/","name":"Concrete Delivery Delays Prompt Revised Schedule for Mosquito Road Closure - Placerville NewsWire","isPartOf":{"@id":"http:\/\/inedc.com\/24\/#website"},"primaryImageOfPage":{"@id":"http:\/\/inedc.com\/24\/government\/concrete-delivery-delays-prompt-revised-schedule-for-mosquito-road-closure\/#primaryimage"},"image":{"@id":"http:\/\/inedc.com\/24\/government\/concrete-delivery-delays-prompt-revised-schedule-for-mosquito-road-closure\/#primaryimage"},"thumbnailUrl":"http:\/\/inedc.com\/24\/wp-content\/uploads\/2024\/02\/ScreenHunter-4899.jpg","datePublished":"2024-03-01T04:04:23+00:00","description":"Delays in Mosquito Road Closure: Concrete Delivery for Bridge Replacement Hits a Snag","breadcrumb":{"@id":"http:\/\/inedc.com\/24\/government\/concrete-delivery-delays-prompt-revised-schedule-for-mosquito-road-closure\/#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["http:\/\/inedc.com\/24\/government\/concrete-delivery-delays-prompt-revised-schedule-for-mosquito-road-closure\/"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"http:\/\/inedc.com\/24\/government\/concrete-delivery-delays-prompt-revised-schedule-for-mosquito-road-closure\/#primaryimage","url":"http:\/\/inedc.com\/24\/wp-content\/uploads\/2024\/02\/ScreenHunter-4899.jpg","contentUrl":"http:\/\/inedc.com\/24\/wp-content\/uploads\/2024\/02\/ScreenHunter-4899.jpg","width":849,"height":615},{"@type":"BreadcrumbList","@id":"http:\/\/inedc.com\/24\/government\/concrete-delivery-delays-prompt-revised-schedule-for-mosquito-road-closure\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"http:\/\/inedc.com\/24\/"},{"@type":"ListItem","position":2,"name":"Concrete Delivery Delays Prompt Revised Schedule for Mosquito Road Closure"}]},{"@type":"WebSite","@id":"http:\/\/inedc.com\/24\/#website","url":"http:\/\/inedc.com\/24\/","name":"News InEDC","description":"Comprehensive News . In El Dorado County - InEDC.com","publisher":{"@id":"http:\/\/inedc.com\/24\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"http:\/\/inedc.com\/24\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"},{"@type":"Organization","@id":"http:\/\/inedc.com\/24\/#organization","name":"News InEDC","url":"http:\/\/inedc.com\/24\/","logo":{"@type":"ImageObject","inLanguage":"en","@id":"http:\/\/inedc.com\/24\/#\/schema\/logo\/image\/","url":"http:\/\/inedc.com\/24\/wp-content\/uploads\/2023\/01\/logo-1.png","contentUrl":"http:\/\/inedc.com\/24\/wp-content\/uploads\/2023\/01\/logo-1.png","width":400,"height":128,"caption":"News InEDC"},"image":{"@id":"http:\/\/inedc.com\/24\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/groups\/EDCnewswire","https:\/\/x.com\/inedccom"]},{"@type":"Person","@id":"http:\/\/inedc.com\/24\/#\/schema\/person\/6fe000a08266795285f981ef371f05f2","name":"Cris Alarcon","image":{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/secure.gravatar.com\/avatar\/9e7e14e06508c2268b6f72e5713ecbbdf36482501dd12b326035e8591505c3bb?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/9e7e14e06508c2268b6f72e5713ecbbdf36482501dd12b326035e8591505c3bb?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9e7e14e06508c2268b6f72e5713ecbbdf36482501dd12b326035e8591505c3bb?s=96&d=mm&r=g","caption":"Cris Alarcon"},"description":"Former Member: Executive Board of Directors, Treasurer, Boys &amp; Girl Club of El Dorado County Western Slope. - Former Member: Board of Directors, Treasurer, Food Bank of El Dorado County. - Opening Team Dealer at Red Hawk Casino - Retried EDC Elections Department Inspector. - Chairman of El Dorado County Charter Review Committee, Youngest Charter Member of the Hangtown Kennel Club. - Political Strategist and Campaign Manager.","sameAs":["http:\/\/inedc.com\/24","https:\/\/www.facebook.com\/groups\/EDCnewswire","https:\/\/x.com\/https:\/\/twitter.com\/inedccom","https:\/\/studio.youtube.com\/channel\/UCPFu68Ud5AouF2N14NzLeyw\/videos"],"url":"http:\/\/inedc.com\/24\/author\/admin\/"}]}},"_links":{"self":[{"href":"http:\/\/inedc.com\/24\/wp-json\/wp\/v2\/posts\/4412","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/inedc.com\/24\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/inedc.com\/24\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/inedc.com\/24\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/inedc.com\/24\/wp-json\/wp\/v2\/comments?post=4412"}],"version-history":[{"count":1,"href":"http:\/\/inedc.com\/24\/wp-json\/wp\/v2\/posts\/4412\/revisions"}],"predecessor-version":[{"id":4414,"href":"http:\/\/inedc.com\/24\/wp-json\/wp\/v2\/posts\/4412\/revisions\/4414"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/inedc.com\/24\/wp-json\/wp\/v2\/media\/4413"}],"wp:attachment":[{"href":"http:\/\/inedc.com\/24\/wp-json\/wp\/v2\/media?parent=4412"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/inedc.com\/24\/wp-json\/wp\/v2\/categories?post=4412"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/inedc.com\/24\/wp-json\/wp\/v2\/tags?post=4412"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}