{"id":9936,"date":"2025-09-03T23:00:25","date_gmt":"2025-09-04T07:00:25","guid":{"rendered":"http:\/\/inedc.com\/24\/?p=9936"},"modified":"2025-09-03T23:00:25","modified_gmt":"2025-09-04T07:00:25","slug":"old-depot-road-temporarily-realigned-for-diamond-springs-parkway-work-in-placerville","status":"publish","type":"post","link":"http:\/\/inedc.com\/24\/weather_roads\/old-depot-road-temporarily-realigned-for-diamond-springs-parkway-work-in-placerville\/","title":{"rendered":"Old Depot Road Temporarily Realigned for Diamond Springs Parkway Work in Placerville"},"content":{"rendered":"<p data-start=\"99\" data-end=\"600\">PLACERVILLE, Calif. \u2014 A segment of Old Depot Road will be temporarily realigned beginning Sept. 4 as part of the county\u2019s Diamond Springs Parkway Phase 1B project, county officials announced Wednesday. The temporary layout will move the existing Old Depot Road intersection with Missouri Flat Road about 600 feet northwest to the Sierra Door &amp; Supply driveway; detour signage will be placed in both directions on Missouri Flat Road to alert drivers to the change.<\/p>\n<p data-start=\"602\" data-end=\"1041\">The short-term alignment is expected to remain in place for approximately 12 months while crews complete work on the parkway and prepare the site for the permanent, signalized intersection where Old Depot Road will meet Diamond Springs Parkway and Missouri Flat Road. Motorists and local businesses should expect altered turning movements and temporary traffic patterns during the construction period.<\/p>\n<p data-start=\"1043\" data-end=\"1456\">The Diamond Springs Parkway Phase 1B project is part of a multi-year effort to build a new four-lane arterial connecting Missouri Flat Road to State Route 49, with curb, gutter, sidewalks and multiple intersection improvements. The work is part of a broader regional transportation plan intended to improve traffic flow and safety in the Diamond Springs\u2013Placerville corridor.<\/p>\n<p data-start=\"1458\" data-end=\"1974\">County officials said the staging change is intended to keep the larger project moving while minimizing the footprint of active construction near Missouri Flat Road.<\/p>\n<blockquote>\n<p data-start=\"1458\" data-end=\"1974\">\u201cWe want the traveling public to better understand the how and why behind the construction projects they\u2019ve been seeing for the last couple years and will continue to see as DOT works to make that area safer,\u201d<\/p>\n<\/blockquote>\n<p data-start=\"1458\" data-end=\"1974\">said Rafael Martinez, director of the county Department of Transportation, in a recent project update.<\/p>\n<p data-start=\"1976\" data-end=\"2308\">The county\u2019s press release encourages drivers to follow posted detour signage and allow extra travel time while crews work. For questions, the release lists the County Transportation main line at (530) 621-5900 (select Option 3 for Engineering) and provides a press contact for media inquiries.<\/p>\n<p data-start=\"2310\" data-end=\"2711\">Local residents and businesses that will be directly affected \u2014 including the property at the Sierra Door &amp; Supply driveway where the temporary intersection will be located \u2014 are being notified through county channels. Officials say the realignment is temporary and will be removed once the permanent signalized intersection and roadway improvements are complete.<\/p>\n<hr data-start=\"2713\" data-end=\"2716\" \/>\n<h2 data-start=\"2718\" data-end=\"2732\">Quick facts<\/h2>\n<ul data-start=\"2733\" data-end=\"3193\">\n<li data-start=\"2733\" data-end=\"2832\">\n<p data-start=\"2735\" data-end=\"2832\">What: Temporary realignment of Old Depot Road and detour. <span class=\"\" data-state=\"closed\"><span class=\"ms-1 inline-flex max-w-full items-center relative top-[-0.094rem] animate-[show_150ms_ease-in]\" data-testid=\"webpage-citation-pill\"><a class=\"flex h-4.5 overflow-hidden rounded-xl px-2 text-[9px] font-medium text-token-text-secondary! bg-[#F4F4F4]! dark:bg-[#303030]! transition-colors duration-150 ease-in-out\" href=\"https:\/\/www.eldoradocounty.ca.gov\/County-Government\/Countywide-Press-Releases\/PART-OF-OLD-DEPOT-ROAD-WILL-BE-REALIGNED-AS-PART-OF-DIAMOND-SPRINGS-PARKWAY-PHASE-1B-PROJECT?utm_source=chatgpt.com\" target=\"_blank\" rel=\"noopener\"><span class=\"relative start-0 bottom-0 flex h-full w-full items-center\"><span class=\"flex h-4 w-full items-center justify-between overflow-hidden\"><span class=\"max-w-full grow truncate overflow-hidden text-center\">El Dorado County<\/span><\/span><\/span><\/a><\/span><\/span><\/p>\n<\/li>\n<li data-start=\"2833\" data-end=\"2950\">\n<p data-start=\"2835\" data-end=\"2950\">When: Realignment begins Sept. 4, 2025; expected to remain about 12 months. <span class=\"\" data-state=\"closed\"><span class=\"ms-1 inline-flex max-w-full items-center relative top-[-0.094rem] animate-[show_150ms_ease-in]\" data-testid=\"webpage-citation-pill\"><a class=\"flex h-4.5 overflow-hidden rounded-xl px-2 text-[9px] font-medium text-token-text-secondary! bg-[#F4F4F4]! dark:bg-[#303030]! transition-colors duration-150 ease-in-out\" href=\"https:\/\/www.eldoradocounty.ca.gov\/County-Government\/Countywide-Press-Releases\/PART-OF-OLD-DEPOT-ROAD-WILL-BE-REALIGNED-AS-PART-OF-DIAMOND-SPRINGS-PARKWAY-PHASE-1B-PROJECT?utm_source=chatgpt.com\" target=\"_blank\" rel=\"noopener\"><span class=\"relative start-0 bottom-0 flex h-full w-full items-center\"><span class=\"flex h-4 w-full items-center justify-between overflow-hidden\"><span class=\"max-w-full grow truncate overflow-hidden text-center\">El Dorado County<\/span><\/span><\/span><\/a><\/span><\/span><\/p>\n<\/li>\n<li data-start=\"2951\" data-end=\"3067\">\n<p data-start=\"2953\" data-end=\"3067\">Where: Intersection of Old Depot Road and Missouri Flat Road, Placerville. <span class=\"\" data-state=\"closed\"><span class=\"ms-1 inline-flex max-w-full items-center relative top-[-0.094rem] animate-[show_150ms_ease-in]\" data-testid=\"webpage-citation-pill\"><a class=\"flex h-4.5 overflow-hidden rounded-xl px-2 text-[9px] font-medium text-token-text-secondary! bg-[#F4F4F4]! dark:bg-[#303030]! transition-colors duration-150 ease-in-out\" href=\"https:\/\/www.eldoradocounty.ca.gov\/County-Government\/Countywide-Press-Releases\/PART-OF-OLD-DEPOT-ROAD-WILL-BE-REALIGNED-AS-PART-OF-DIAMOND-SPRINGS-PARKWAY-PHASE-1B-PROJECT?utm_source=chatgpt.com\" target=\"_blank\" rel=\"noopener\"><span class=\"relative start-0 bottom-0 flex h-full w-full items-center\"><span class=\"flex h-4 w-full items-center justify-between overflow-hidden\"><span class=\"max-w-full grow truncate overflow-hidden text-center\">El Dorado County<\/span><\/span><\/span><\/a><\/span><\/span><\/p>\n<\/li>\n<li data-start=\"3068\" data-end=\"3193\">\n<p data-start=\"3070\" data-end=\"3193\">Contact: El Dorado County Transportation \u2014 (530) 621-5900 (Option 3 for Engineering).<\/p>\n<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Starting Sept. 4, a portion of Old Depot Road will be temporarily realigned at Missouri Flat Road for Diamond Springs Parkway work. Expect detours and altered turns for about a year.<br \/>\nEl Dorado County<\/p>\n","protected":false},"author":1,"featured_media":9937,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jnews-multi-image_gallery":[],"jnews_single_post":{"format":"standard","override":[{"template":"7","parallax":"1","layout":"no-sidebar-narrow","sidebar":"default-sidebar","second_sidebar":"default-sidebar","sticky_sidebar":"1","share_position":"float","share_float_style":"share-normal","show_share_counter":"1","show_view_counter":"1","show_featured":"1","show_post_meta":"1","show_post_author":"1","show_post_author_image":"1","show_post_date":"1","post_date_format":"default","post_date_format_custom":"Y\/m\/d","show_post_category":"1","post_reading_time_wpm":"300","post_calculate_word_method":"str_word_count","show_zoom_button":"0","zoom_button_out_step":"2","zoom_button_in_step":"3","show_post_tag":"1","show_popup_post":"1","number_popup_post":"1","show_author_box":"1","show_post_related":"1","show_inline_post_related":"1"}],"image_override":[{"single_post_thumbnail_size":"crop-500","single_post_gallery_size":"crop-500"}],"trending_post_position":"meta","trending_post_label":"Trending","sponsored_post_label":"Sponsored by","disable_ad":"0","subtitle":"Detour begins Sept. 4 \u2014 temporary intersection moved 600 feet; drivers should expect changed turning patterns for about 12 months"},"jnews_primary_category":[],"jnews_social_meta":[],"jnews_override_counter":{"view_counter_number":"0","share_counter_number":"0","like_counter_number":"0","dislike_counter_number":"0"},"footnotes":""},"categories":[26],"tags":[],"class_list":["post-9936","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-weather_roads"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Old Depot Road Temporarily Realigned for Diamond Springs Parkway Work in Placerville - Placerville NewsWire<\/title>\n<meta name=\"description\" content=\"El Dorado County will realign Old Depot Road at Missouri Flat Road starting Sept. 4; detour signs in place \u2014 the temporary change will last about 12 months.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/inedc.com\/24\/weather_roads\/old-depot-road-temporarily-realigned-for-diamond-springs-parkway-work-in-placerville\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Old Depot Road Temporarily Realigned for Diamond Springs Parkway Work in Placerville - Placerville NewsWire\" \/>\n<meta property=\"og:description\" content=\"El Dorado County will realign Old Depot Road at Missouri Flat Road starting Sept. 4; detour signs in place \u2014 the temporary change will last about 12 months.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/inedc.com\/24\/weather_roads\/old-depot-road-temporarily-realigned-for-diamond-springs-parkway-work-in-placerville\/\" \/>\n<meta property=\"og:site_name\" content=\"Placerville NewsWire\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/groups\/EDCnewswire\" \/>\n<meta property=\"article:author\" content=\"https:\/\/www.facebook.com\/groups\/EDCnewswire\" \/>\n<meta property=\"article:published_time\" content=\"2025-09-04T07:00:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/inedc.com\/24\/wp-content\/uploads\/2025\/09\/ScreenHunter-5762.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"783\" \/>\n\t<meta property=\"og:image:height\" content=\"461\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Cris Alarcon\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@https:\/\/twitter.com\/inedccom\" \/>\n<meta name=\"twitter:site\" content=\"@inedccom\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Cris Alarcon\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/inedc.com\\\/24\\\/weather_roads\\\/old-depot-road-temporarily-realigned-for-diamond-springs-parkway-work-in-placerville\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/inedc.com\\\/24\\\/weather_roads\\\/old-depot-road-temporarily-realigned-for-diamond-springs-parkway-work-in-placerville\\\/\"},\"author\":{\"name\":\"Cris Alarcon\",\"@id\":\"http:\\\/\\\/inedc.com\\\/24\\\/#\\\/schema\\\/person\\\/6fe000a08266795285f981ef371f05f2\"},\"headline\":\"Old Depot Road Temporarily Realigned for Diamond Springs Parkway Work in Placerville\",\"datePublished\":\"2025-09-04T07:00:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/inedc.com\\\/24\\\/weather_roads\\\/old-depot-road-temporarily-realigned-for-diamond-springs-parkway-work-in-placerville\\\/\"},\"wordCount\":423,\"commentCount\":0,\"publisher\":{\"@id\":\"http:\\\/\\\/inedc.com\\\/24\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/inedc.com\\\/24\\\/weather_roads\\\/old-depot-road-temporarily-realigned-for-diamond-springs-parkway-work-in-placerville\\\/#primaryimage\"},\"thumbnailUrl\":\"http:\\\/\\\/inedc.com\\\/24\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/ScreenHunter-5762.jpg\",\"articleSection\":[\"Weather-Roads\"],\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/inedc.com\\\/24\\\/weather_roads\\\/old-depot-road-temporarily-realigned-for-diamond-springs-parkway-work-in-placerville\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/inedc.com\\\/24\\\/weather_roads\\\/old-depot-road-temporarily-realigned-for-diamond-springs-parkway-work-in-placerville\\\/\",\"url\":\"https:\\\/\\\/inedc.com\\\/24\\\/weather_roads\\\/old-depot-road-temporarily-realigned-for-diamond-springs-parkway-work-in-placerville\\\/\",\"name\":\"Old Depot Road Temporarily Realigned for Diamond Springs Parkway Work in Placerville - Placerville NewsWire\",\"isPartOf\":{\"@id\":\"http:\\\/\\\/inedc.com\\\/24\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/inedc.com\\\/24\\\/weather_roads\\\/old-depot-road-temporarily-realigned-for-diamond-springs-parkway-work-in-placerville\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/inedc.com\\\/24\\\/weather_roads\\\/old-depot-road-temporarily-realigned-for-diamond-springs-parkway-work-in-placerville\\\/#primaryimage\"},\"thumbnailUrl\":\"http:\\\/\\\/inedc.com\\\/24\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/ScreenHunter-5762.jpg\",\"datePublished\":\"2025-09-04T07:00:25+00:00\",\"description\":\"El Dorado County will realign Old Depot Road at Missouri Flat Road starting Sept. 4; detour signs in place \u2014 the temporary change will last about 12 months.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/inedc.com\\\/24\\\/weather_roads\\\/old-depot-road-temporarily-realigned-for-diamond-springs-parkway-work-in-placerville\\\/#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/inedc.com\\\/24\\\/weather_roads\\\/old-depot-road-temporarily-realigned-for-diamond-springs-parkway-work-in-placerville\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\\\/\\\/inedc.com\\\/24\\\/weather_roads\\\/old-depot-road-temporarily-realigned-for-diamond-springs-parkway-work-in-placerville\\\/#primaryimage\",\"url\":\"http:\\\/\\\/inedc.com\\\/24\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/ScreenHunter-5762.jpg\",\"contentUrl\":\"http:\\\/\\\/inedc.com\\\/24\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/ScreenHunter-5762.jpg\",\"width\":783,\"height\":461,\"caption\":\"Old Depot Road\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/inedc.com\\\/24\\\/weather_roads\\\/old-depot-road-temporarily-realigned-for-diamond-springs-parkway-work-in-placerville\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"http:\\\/\\\/inedc.com\\\/24\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Old Depot Road Temporarily Realigned for Diamond Springs Parkway Work in Placerville\"}]},{\"@type\":\"WebSite\",\"@id\":\"http:\\\/\\\/inedc.com\\\/24\\\/#website\",\"url\":\"http:\\\/\\\/inedc.com\\\/24\\\/\",\"name\":\"News InEDC\",\"description\":\"Comprehensive News . In El Dorado County - InEDC.com\",\"publisher\":{\"@id\":\"http:\\\/\\\/inedc.com\\\/24\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"http:\\\/\\\/inedc.com\\\/24\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"},{\"@type\":\"Organization\",\"@id\":\"http:\\\/\\\/inedc.com\\\/24\\\/#organization\",\"name\":\"News InEDC\",\"url\":\"http:\\\/\\\/inedc.com\\\/24\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"http:\\\/\\\/inedc.com\\\/24\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"http:\\\/\\\/inedc.com\\\/24\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/logo-1.png\",\"contentUrl\":\"http:\\\/\\\/inedc.com\\\/24\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/logo-1.png\",\"width\":400,\"height\":128,\"caption\":\"News InEDC\"},\"image\":{\"@id\":\"http:\\\/\\\/inedc.com\\\/24\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/groups\\\/EDCnewswire\",\"https:\\\/\\\/x.com\\\/inedccom\"]},{\"@type\":\"Person\",\"@id\":\"http:\\\/\\\/inedc.com\\\/24\\\/#\\\/schema\\\/person\\\/6fe000a08266795285f981ef371f05f2\",\"name\":\"Cris Alarcon\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9e7e14e06508c2268b6f72e5713ecbbdf36482501dd12b326035e8591505c3bb?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9e7e14e06508c2268b6f72e5713ecbbdf36482501dd12b326035e8591505c3bb?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9e7e14e06508c2268b6f72e5713ecbbdf36482501dd12b326035e8591505c3bb?s=96&d=mm&r=g\",\"caption\":\"Cris Alarcon\"},\"description\":\"Former Member: Executive Board of Directors, Treasurer, Boys &amp; Girl Club of El Dorado County Western Slope. - Former Member: Board of Directors, Treasurer, Food Bank of El Dorado County. - Opening Team Dealer at Red Hawk Casino - Retried EDC Elections Department Inspector. - Chairman of El Dorado County Charter Review Committee, Youngest Charter Member of the Hangtown Kennel Club. - Political Strategist and Campaign Manager.\",\"sameAs\":[\"http:\\\/\\\/inedc.com\\\/24\",\"https:\\\/\\\/www.facebook.com\\\/groups\\\/EDCnewswire\",\"https:\\\/\\\/x.com\\\/https:\\\/\\\/twitter.com\\\/inedccom\",\"https:\\\/\\\/studio.youtube.com\\\/channel\\\/UCPFu68Ud5AouF2N14NzLeyw\\\/videos\"],\"url\":\"http:\\\/\\\/inedc.com\\\/24\\\/author\\\/admin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Old Depot Road Temporarily Realigned for Diamond Springs Parkway Work in Placerville - Placerville NewsWire","description":"El Dorado County will realign Old Depot Road at Missouri Flat Road starting Sept. 4; detour signs in place \u2014 the temporary change will last about 12 months.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/inedc.com\/24\/weather_roads\/old-depot-road-temporarily-realigned-for-diamond-springs-parkway-work-in-placerville\/","og_locale":"en_US","og_type":"article","og_title":"Old Depot Road Temporarily Realigned for Diamond Springs Parkway Work in Placerville - Placerville NewsWire","og_description":"El Dorado County will realign Old Depot Road at Missouri Flat Road starting Sept. 4; detour signs in place \u2014 the temporary change will last about 12 months.","og_url":"https:\/\/inedc.com\/24\/weather_roads\/old-depot-road-temporarily-realigned-for-diamond-springs-parkway-work-in-placerville\/","og_site_name":"Placerville NewsWire","article_publisher":"https:\/\/www.facebook.com\/groups\/EDCnewswire","article_author":"https:\/\/www.facebook.com\/groups\/EDCnewswire","article_published_time":"2025-09-04T07:00:25+00:00","og_image":[{"width":783,"height":461,"url":"https:\/\/inedc.com\/24\/wp-content\/uploads\/2025\/09\/ScreenHunter-5762.jpg","type":"image\/jpeg"}],"author":"Cris Alarcon","twitter_card":"summary_large_image","twitter_creator":"@https:\/\/twitter.com\/inedccom","twitter_site":"@inedccom","twitter_misc":{"Written by":"Cris Alarcon","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/inedc.com\/24\/weather_roads\/old-depot-road-temporarily-realigned-for-diamond-springs-parkway-work-in-placerville\/#article","isPartOf":{"@id":"https:\/\/inedc.com\/24\/weather_roads\/old-depot-road-temporarily-realigned-for-diamond-springs-parkway-work-in-placerville\/"},"author":{"name":"Cris Alarcon","@id":"http:\/\/inedc.com\/24\/#\/schema\/person\/6fe000a08266795285f981ef371f05f2"},"headline":"Old Depot Road Temporarily Realigned for Diamond Springs Parkway Work in Placerville","datePublished":"2025-09-04T07:00:25+00:00","mainEntityOfPage":{"@id":"https:\/\/inedc.com\/24\/weather_roads\/old-depot-road-temporarily-realigned-for-diamond-springs-parkway-work-in-placerville\/"},"wordCount":423,"commentCount":0,"publisher":{"@id":"http:\/\/inedc.com\/24\/#organization"},"image":{"@id":"https:\/\/inedc.com\/24\/weather_roads\/old-depot-road-temporarily-realigned-for-diamond-springs-parkway-work-in-placerville\/#primaryimage"},"thumbnailUrl":"http:\/\/inedc.com\/24\/wp-content\/uploads\/2025\/09\/ScreenHunter-5762.jpg","articleSection":["Weather-Roads"],"inLanguage":"en","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/inedc.com\/24\/weather_roads\/old-depot-road-temporarily-realigned-for-diamond-springs-parkway-work-in-placerville\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/inedc.com\/24\/weather_roads\/old-depot-road-temporarily-realigned-for-diamond-springs-parkway-work-in-placerville\/","url":"https:\/\/inedc.com\/24\/weather_roads\/old-depot-road-temporarily-realigned-for-diamond-springs-parkway-work-in-placerville\/","name":"Old Depot Road Temporarily Realigned for Diamond Springs Parkway Work in Placerville - Placerville NewsWire","isPartOf":{"@id":"http:\/\/inedc.com\/24\/#website"},"primaryImageOfPage":{"@id":"https:\/\/inedc.com\/24\/weather_roads\/old-depot-road-temporarily-realigned-for-diamond-springs-parkway-work-in-placerville\/#primaryimage"},"image":{"@id":"https:\/\/inedc.com\/24\/weather_roads\/old-depot-road-temporarily-realigned-for-diamond-springs-parkway-work-in-placerville\/#primaryimage"},"thumbnailUrl":"http:\/\/inedc.com\/24\/wp-content\/uploads\/2025\/09\/ScreenHunter-5762.jpg","datePublished":"2025-09-04T07:00:25+00:00","description":"El Dorado County will realign Old Depot Road at Missouri Flat Road starting Sept. 4; detour signs in place \u2014 the temporary change will last about 12 months.","breadcrumb":{"@id":"https:\/\/inedc.com\/24\/weather_roads\/old-depot-road-temporarily-realigned-for-diamond-springs-parkway-work-in-placerville\/#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/inedc.com\/24\/weather_roads\/old-depot-road-temporarily-realigned-for-diamond-springs-parkway-work-in-placerville\/"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/inedc.com\/24\/weather_roads\/old-depot-road-temporarily-realigned-for-diamond-springs-parkway-work-in-placerville\/#primaryimage","url":"http:\/\/inedc.com\/24\/wp-content\/uploads\/2025\/09\/ScreenHunter-5762.jpg","contentUrl":"http:\/\/inedc.com\/24\/wp-content\/uploads\/2025\/09\/ScreenHunter-5762.jpg","width":783,"height":461,"caption":"Old Depot Road"},{"@type":"BreadcrumbList","@id":"https:\/\/inedc.com\/24\/weather_roads\/old-depot-road-temporarily-realigned-for-diamond-springs-parkway-work-in-placerville\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"http:\/\/inedc.com\/24\/"},{"@type":"ListItem","position":2,"name":"Old Depot Road Temporarily Realigned for Diamond Springs Parkway Work in Placerville"}]},{"@type":"WebSite","@id":"http:\/\/inedc.com\/24\/#website","url":"http:\/\/inedc.com\/24\/","name":"News InEDC","description":"Comprehensive News . In El Dorado County - InEDC.com","publisher":{"@id":"http:\/\/inedc.com\/24\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"http:\/\/inedc.com\/24\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"},{"@type":"Organization","@id":"http:\/\/inedc.com\/24\/#organization","name":"News InEDC","url":"http:\/\/inedc.com\/24\/","logo":{"@type":"ImageObject","inLanguage":"en","@id":"http:\/\/inedc.com\/24\/#\/schema\/logo\/image\/","url":"http:\/\/inedc.com\/24\/wp-content\/uploads\/2023\/01\/logo-1.png","contentUrl":"http:\/\/inedc.com\/24\/wp-content\/uploads\/2023\/01\/logo-1.png","width":400,"height":128,"caption":"News InEDC"},"image":{"@id":"http:\/\/inedc.com\/24\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/groups\/EDCnewswire","https:\/\/x.com\/inedccom"]},{"@type":"Person","@id":"http:\/\/inedc.com\/24\/#\/schema\/person\/6fe000a08266795285f981ef371f05f2","name":"Cris Alarcon","image":{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/secure.gravatar.com\/avatar\/9e7e14e06508c2268b6f72e5713ecbbdf36482501dd12b326035e8591505c3bb?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/9e7e14e06508c2268b6f72e5713ecbbdf36482501dd12b326035e8591505c3bb?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9e7e14e06508c2268b6f72e5713ecbbdf36482501dd12b326035e8591505c3bb?s=96&d=mm&r=g","caption":"Cris Alarcon"},"description":"Former Member: Executive Board of Directors, Treasurer, Boys &amp; Girl Club of El Dorado County Western Slope. - Former Member: Board of Directors, Treasurer, Food Bank of El Dorado County. - Opening Team Dealer at Red Hawk Casino - Retried EDC Elections Department Inspector. - Chairman of El Dorado County Charter Review Committee, Youngest Charter Member of the Hangtown Kennel Club. - Political Strategist and Campaign Manager.","sameAs":["http:\/\/inedc.com\/24","https:\/\/www.facebook.com\/groups\/EDCnewswire","https:\/\/x.com\/https:\/\/twitter.com\/inedccom","https:\/\/studio.youtube.com\/channel\/UCPFu68Ud5AouF2N14NzLeyw\/videos"],"url":"http:\/\/inedc.com\/24\/author\/admin\/"}]}},"_links":{"self":[{"href":"http:\/\/inedc.com\/24\/wp-json\/wp\/v2\/posts\/9936","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/inedc.com\/24\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/inedc.com\/24\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/inedc.com\/24\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/inedc.com\/24\/wp-json\/wp\/v2\/comments?post=9936"}],"version-history":[{"count":1,"href":"http:\/\/inedc.com\/24\/wp-json\/wp\/v2\/posts\/9936\/revisions"}],"predecessor-version":[{"id":9938,"href":"http:\/\/inedc.com\/24\/wp-json\/wp\/v2\/posts\/9936\/revisions\/9938"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/inedc.com\/24\/wp-json\/wp\/v2\/media\/9937"}],"wp:attachment":[{"href":"http:\/\/inedc.com\/24\/wp-json\/wp\/v2\/media?parent=9936"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/inedc.com\/24\/wp-json\/wp\/v2\/categories?post=9936"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/inedc.com\/24\/wp-json\/wp\/v2\/tags?post=9936"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}