{"id":15346,"date":"2026-11-27T19:28:40","date_gmt":"2026-11-28T04:28:40","guid":{"rendered":"https:\/\/inedc.com\/26\/?p=15346"},"modified":"2026-11-27T19:28:40","modified_gmt":"2026-11-28T04:28:40","slug":"el-dorado-countys-first-chick-fil-a-proposed-near-placerville","status":"publish","type":"post","link":"https:\/\/inedc.com\/26\/business\/el-dorado-countys-first-chick-fil-a-proposed-near-placerville\/","title":{"rendered":"El Dorado County\u2019s First Chick-fil-A Proposed Near Placerville"},"content":{"rendered":"<p>PLACERVILLE, Calif. \u2014 El Dorado County could soon get its first Chick-fil-A, with a development application proposing a new restaurant at the entrance to Crossings at El Dorado, the growing shopping center along Missouri Flat Road just north of Highway 50.<\/p>\n<p>The proposal, submitted by Palos Verdes Properties Inc., is now before the county&#8217;s Zoning Administrator, who is scheduled to consider Conditional Use Permit CUP25-0007 during a public hearing Wednesday, Dec. 2.<\/p>\n<p>The proposed restaurant would occupy approximately 1.5 acres near the southwest corner of Missouri Flat Road and Headington Road, within the Diamond Springs-El Dorado Community Region. The location is part of the commercial corridor serving Placerville, Diamond Springs and surrounding western El Dorado County communities.<\/p>\n<p>According to the county&#8217;s latest hearing agenda, the project calls for a 5,100-square-foot restaurant featuring a dual-lane drive-through.<\/p>\n<p>The proposal represents a significant step beyond the early speculation surrounding Chick-fil-A&#8217;s possible arrival at Crossings at El Dorado.<\/p>\n<h3><strong>From leasing speculation to a formal development application<\/strong><\/h3>\n<p>Chick-fil-A first attracted attention locally in November 2025, when its name and logo appeared in leasing materials promoting Crossings at El Dorado.<\/p>\n<p>At that time, the appearance of the restaurant chain in marketing materials suggested interest in the development but did not establish that a lease had been signed or that construction was imminent.<\/p>\n<p>The situation has since advanced into the county&#8217;s formal land-use approval process.<\/p>\n<p>In July 2026, the Diamond Springs and El Dorado Community Advisory Committee reviewed an earlier version of the project. That proposal described a 4,880-square-foot restaurant with a two-lane drive-through and 43 parking spaces.<\/p>\n<p>The earlier application identified approximately 1.507 acres near Missouri Flat Road and Headington Road.<\/p>\n<p>The current county hearing documents describe a revised 5,100-square-foot project. The differences in building size and parcel identification reflect the importance of relying on the latest application documents when evaluating the proposal.<\/p>\n<h3><strong>Drive-through configuration and residential impacts among issues<\/strong><\/h3>\n<p>While the prospect of another national restaurant brand may attract attention, the county&#8217;s review involves several development standards that the applicant is asking to modify.<\/p>\n<p>The current application includes six specific requests:<\/p>\n<ul>\n<li>\n<div>\n<div>\n<p><strong>Building:<\/strong> Construction and operation of a 5,100-square-foot fast-food restaurant.<\/p>\n<\/div>\n<\/div>\n<\/li>\n<li>\n<div>\n<div>\n<p><strong>Drive-through:<\/strong> A dual-lane configuration with lanes measuring 10 feet wide, rather than the county&#8217;s 12-foot standard.<\/p>\n<\/div>\n<\/div>\n<\/li>\n<li>\n<div>\n<div>\n<p><strong>Lighting:<\/strong> Parking lot light fixtures reaching 25 feet, exceeding the standard 20-foot height.<\/p>\n<\/div>\n<\/div>\n<\/li>\n<li>\n<div>\n<div>\n<p><strong>Residential setback:<\/strong> A drive-through lane positioned 6 feet from the nearest residential property, where the standard setback is 50 feet.<\/p>\n<\/div>\n<\/div>\n<\/li>\n<li>\n<div>\n<div>\n<p><strong>Vehicle queuing:<\/strong> Permission for drive-through customer queues within the proposed parking lot.<\/p>\n<\/div>\n<\/div>\n<\/li>\n<li>\n<div>\n<div>\n<p><strong>Operating hours:<\/strong> Opening at 6:30 a.m., 30 minutes earlier than the standard 7 a.m. starting time. Proposed closing time is 10 p.m.<\/p>\n<\/div>\n<\/div>\n<\/li>\n<\/ul>\n<p>The residential setback is particularly noteworthy.<\/p>\n<p>A drive-through lane positioned just 6 feet from the nearest residential property makes the project&#8217;s relationship with neighboring homes an important consideration during the county&#8217;s review.<\/p>\n<p>The requested modifications are not automatic approvals. They are part of the conditional use permit decision that the Zoning Administrator must evaluate.<\/p>\n<h3><strong>County staff recommends approval<\/strong><\/h3>\n<p>The county&#8217;s published agenda identifies a recommendation from Planning and Building Department staff to approve the application.<\/p>\n<p>The staff recommendation states:<\/p>\n<blockquote><p>&#8220;Approve Conditional Use Permit CUP25-0007, based on the Findings and subject to the Conditions of Approval as presented.&#8221;<\/p><\/blockquote>\n<p>Staff also recommends finding the project categorically exempt from further environmental review under Section 15303 of the California Environmental Quality Act guidelines, which addresses new construction or conversion of small structures.<\/p>\n<p>That recommendation is not a final approval. The Zoning Administrator will make the determination following the public hearing.<\/p>\n<p>The project falls within Supervisorial District 3.<\/p>\n<h3><strong>A growing commercial destination along Missouri Flat Road<\/strong><\/h3>\n<p>The proposed Chick-fil-A would add another recognizable restaurant to Crossings at El Dorado, a major commercial development near the Missouri Flat Road interchange with Highway 50.<\/p>\n<p>The shopping center has been developed as a regional retail destination, bringing new shopping, restaurants and services to an area that serves residents throughout the western slope of El Dorado County.<\/p>\n<p>The addition of Chick-fil-A would further expand the area&#8217;s fast-food and drive-through offerings.<\/p>\n<p>For residents, the development also raises practical questions about traffic circulation, vehicle queuing and the relationship between commercial activity and nearby residential properties.<\/p>\n<p>Those considerations will be part of the county&#8217;s conditional use permit review.<\/p>\n<h3><strong>Public hearing scheduled for Dec. 2<\/strong><\/h3>\n<p>The El Dorado County Zoning Administrator is scheduled to hear the Chick-fil-A application at 3 p.m. Wednesday, Dec. 2, 2026.<\/p>\n<p>The meeting will take place at:<\/p>\n<p><strong>El Dorado County Government Center<\/strong><\/p>\n<p>2850 Fairlane Court, Building C Hearing Room<\/p>\n<p>Placerville, CA 95667<\/p>\n<p>The meeting will also be available through the county&#8217;s online meeting platform.<\/p>\n<p>Residents interested in the proposal can review the application materials, staff report and supporting exhibits through the county&#8217;s official agenda.<\/p>\n<ul>\n<li>\n<div>\n<div>\n<p><a href=\"https:\/\/eldorado.legistar.com\/MeetingDetail.aspx?G=1B73DE4C-938C-4A3A-92A4-CDDFE91781FE&amp;GID=57&amp;LEGID=5326&amp;utm_source=chatgpt.com\">County hearing agenda and meeting information<\/a><\/p>\n<\/div>\n<\/div>\n<\/li>\n<li>\n<div>\n<div>\n<p><a href=\"https:\/\/eldorado.legistar.com\/LegislationDetail.aspx?G=1B73DE4C-938C-4A3A-92A4-CDDFE91781FE&amp;GUID=8462C85C-F9FF-47F5-BE0D-27FAD2EACFEF&amp;ID=8330025&amp;utm_source=chatgpt.com\">Chick-fil-A Conditional Use Permit CUP25-0007 \u2014 staff report and exhibits<\/a><\/p>\n<\/div>\n<\/div>\n<\/li>\n<\/ul>\n<p>For now, Chick-fil-A remains a proposal rather than an approved construction project.<\/p>\n<p>But after appearing in leasing materials a year ago, the restaurant has moved into a formal county approval process. The Dec. 2 hearing will be the next significant milestone in determining whether El Dorado County gets its first location of the popular chicken restaurant chain.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>El Dorado County\u2019s first Chick-fil-A is proposed for Crossings at El Dorado near Placerville. The county hearing is scheduled for Dec. 2.<\/p>\n","protected":false},"author":1,"featured_media":15347,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jnews-multi-image_gallery":[],"jnews_single_post":{"format":"standard","override":[{"template":"7","parallax":"1","layout":"no-sidebar-narrow","sidebar":"default-sidebar","second_sidebar":"default-sidebar","sticky_sidebar":"1","share_position":"float","share_float_style":"share-normal","show_share_counter":"1","show_view_counter":"1","show_featured":"1","show_post_meta":"1","show_post_author":"1","show_post_author_image":"1","show_post_date":"1","post_date_format":"default","post_date_format_custom":"Y\/m\/d","show_post_category":"1","post_reading_time_wpm":"300","post_calculate_word_method":"str_word_count","show_zoom_button":"0","zoom_button_out_step":"2","zoom_button_in_step":"3","show_post_tag":"1","show_popup_post":"1","show_comment_section":"1","number_popup_post":"1","show_author_box":"1","show_post_related":"1","show_inline_post_related":"1"}],"image_override":[{"single_post_thumbnail_size":"crop-500","single_post_gallery_size":"crop-500"}],"trending_post_position":"meta","trending_post_label":"Trending","sponsored_post_label":"Sponsored by","disable_ad":"0","subtitle":"A proposed restaurant at Crossings at El Dorado would bring the popular chicken chain to Missouri Flat Road. County officials are scheduled to consider the development permit Dec. 2."},"jnews_primary_category":[],"jnews_social_meta":[],"jnews_override_counter":{"view_counter_number":"0","share_counter_number":"0","like_counter_number":"0","dislike_counter_number":"0"},"footnotes":""},"categories":[6],"tags":[],"class_list":["post-15346","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-business"],"_links":{"self":[{"href":"https:\/\/inedc.com\/26\/wp-json\/wp\/v2\/posts\/15346","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inedc.com\/26\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/inedc.com\/26\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/inedc.com\/26\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/inedc.com\/26\/wp-json\/wp\/v2\/comments?post=15346"}],"version-history":[{"count":1,"href":"https:\/\/inedc.com\/26\/wp-json\/wp\/v2\/posts\/15346\/revisions"}],"predecessor-version":[{"id":15348,"href":"https:\/\/inedc.com\/26\/wp-json\/wp\/v2\/posts\/15346\/revisions\/15348"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inedc.com\/26\/wp-json\/wp\/v2\/media\/15347"}],"wp:attachment":[{"href":"https:\/\/inedc.com\/26\/wp-json\/wp\/v2\/media?parent=15346"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/inedc.com\/26\/wp-json\/wp\/v2\/categories?post=15346"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/inedc.com\/26\/wp-json\/wp\/v2\/tags?post=15346"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}